Modelado BIM para el proyecto de un taller y punto de carga destinado a vehículos eléctricos
dc.audience.mediator | Universidad de Jaén. Escuela Politécnica Superior (Jaén) | es_ES |
dc.contributor.advisor | Gallego Álvarez, Francisco Javier | |
dc.contributor.author | López Mellado, Sergio | |
dc.contributor.other | Universidad de Jaén. Ingeniería Mecánica y Minera | es_ES |
dc.date.accessioned | 2024-12-24T10:19:32Z | |
dc.date.available | 2024-12-24T10:19:32Z | |
dc.date.issued | 2024-09-20 | |
dc.description.abstract | Este Trabajo de Fin de Grado se centra en la aplicación de la tecnología BIM (Building Information Modelling), desarrollando el diseño y el modelado de un taller y punto de carga de coches eléctricos en el polígono industrial "Los Olivares". Se ha desarrollado una memoria descriptiva del proyecto y justificativa de su diseño de acuerdo a normativa. Se ha creado un modelo 3D con los elementos arquitectónicos, estructurales y parte de instalaciones, de manera federada y coordinando las disciplinas, de acuerdo a un plan de ejecución BIM. El dimensionamiento de la estructura ha sido aproximado y no basado en los cálculos estructurales pertinentes, lo cual no era objeto del trabajo. A partir del modelo generado se ha obtenido diversa documentación de utilidad para la redacción del proyecto constructivo, como planos, mediciones, tablas de planificación y presupuestos, así como representaciones realistas de la edificación. | es_ES |
dc.description.abstract | This Final Degree Project focuses on the application of BIM (Building Information Modelling) technology, developing the design and modelling of a workshop and charging point for electric cars in the ‘Los Olivares’ industrial estate. A descriptive report of the project and justification of its design in accordance with regulations has been developed. A 3D model has been created with the architectural and structural elements and part of the installations, in a federated manner and coordinating the disciplines, according to a BIM execution plan. The dimensioning of the structure has been approximate and not based on the relevant structural calculations, which was not the object of the work. From the model generated, various useful documentation has been obtained for the drafting of the construction project, such as plans, measurements, planning tables and budgets, as well as realistic representations of the building. | es_ES |
dc.identifier.uri | https://hdl.handle.net/10953.1/25886 | |
dc.language.iso | spa | es_ES |
dc.publisher | Jaén: Universidad de Jaén | es_ES |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | Construcción Industrial | es_ES |
dc.subject.classification | 3305.01 | es_ES |
dc.subject.classification | 3305.21 | es_ES |
dc.subject.other | Diseño arquitectónico | es_ES |
dc.subject.other | Architectural design | es_ES |
dc.subject.other | Construcciones metálicas | es_ES |
dc.subject.other | Metallic constructions | es_ES |
dc.title | Modelado BIM para el proyecto de un taller y punto de carga destinado a vehículos eléctricos | es_ES |
dc.type | info:eu-repo/semantics/bachelorThesis | es_ES |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- TFG_Sergio_López_Mellado - Sergio López Mellado.pdf
- Tamaño:
- 8.9 MB
- Formato:
- Adobe Portable Document Format
- Descripción:
Bloque de licencias
1 - 1 de 1
No hay miniatura disponible
- Nombre:
- license.txt
- Tamaño:
- 3.11 KB
- Formato:
- Item-specific license agreed upon to submission
- Descripción: